Estimate a steel job in 5 minutes.
Not 5 hours.
Upload your structural drawings. Steelflo finds and boxes every steel member on every page, detects connections, and builds your counts and weights. You review the boxes, set lengths, and export a priced BOM — before your estimator finishes their morning coffee.
4 minutes · no credit card · no call
- Bids per month
- 4X MORE BIDS / MO
- Speed
- 88% OF JOBS UNDER 5 MIN
- Fabricators
- 64 SHOPS RUNNING TAKEOFFS
- YOUR DRAWINGS NEVER LEAVE YOUR ACCOUNT
SHT S-001 / DETECTION — LIVE REPLAY
Watch a real takeoff run.
This is a replay of actual product output — every box the AI stamps becomes a line on the bill of materials.
| SHAPE | EA | LF | LB |
|---|
What does your Wednesday actually cost?
Run the numbers. Every fabricator who's done this math has signed up the same day.
“I submitted two bids. I skipped the third because I ran out of time. That third one was the $480K job.”
BUSINESS PLAN ($599/MO) ≈ $20/DAY · YOUR ESTIMATOR = $40/HR · STEELFLO SAVES THEM ~6 HRS PER TAKEOFF
We are not expensive. We are the cheapest line item on your P&L.
The same week, on two schedules.
WITHOUT STEELFLO
MONDAY
Three bid invitations land in your inbox. They’re due Friday.
TUESDAY
You start clicking through 47 sheets at half scale, squinting at W12×26s.
WEDNESDAY
A revision on sheet 31 changes the beam schedule. Recount everything.
THURSDAY
Totals don’t tie. You count again. You eat dinner at your desk.
FRIDAY 4:52 PM
You submit two bids. You skip the third. That third one was the $480K job.
WITH STEELFLO
MONDAY 8:47 AM
Three PDFs uploaded.
MONDAY 9:11 AM
Three takeoffs complete. Weights, counts, schedules — itemized.
TUESDAY
Three bids out the door. You start on bid four.
WEDNESDAY
Bid four is done. You start researching job five.
FRIDAY
You bid six jobs. You’ll win two. Last month you bid eight all month.
How it works
Three steps. No training. No setup call. Your first 3 takeoffs are free.
Drop the PDF
Plans and shop drawings, up to 200MB per PDF. AISC, EN, BS/IS, AS/NZS, GB, or cold-formed (CFS/SSMA) — Steelflo auto-detects your standard and picks imperial or metric automatically.
We do the takeoff
Member-by-member identification. Weight lookup. Connection counts. Coating detection. Every detection is tagged to its sheet and location on the drawing so you can verify in minutes, not hours.
You bid
Export to CSV, copy straight into your estimating template, or price it live in-app. Nesting-optimized order sheet included. Average time from upload to bid-ready output: under 5 minutes.
Everything from detection to order.
FIG 01
Dual AI Detection Engine
OCR and vision AI work together to find every beam, column, plate, angle, and brace — plus connections, copes, bolt patterns, and camber. Each detection includes a confidence score and source — you review, you approve.
Handles text labels, CAD annotations, flattened PDFs, and hand-drawn markups. Spatial clustering reassembles split labels that span multiple lines. Connection details are automatically extracted from shop drawings and design drawings alike.

FIG 02
Member Schedule Key Parsing
Reads schedule sheets like S008 — Column (SC) Schedules, Ledger (L) Schedules, Grade Beam, Footing — and resolves marks (SC1, L1, GB1) on plan pages back to actual section sizes automatically. Standard practice on commercial and industrial drawings; nobody else handles this end-to-end.
AI reads each schedule page with strict validation, builds a mark-to-section map, validates entries against all six steel databases, then resolves every callout on the plan pages. If a section needs correction, edit the mark once and every detection updates.

FIG 03
Connection, Cope & Bolt Detection
AI reads your shop drawings and identifies connection details automatically — shear tabs, moment connections, base plates, bolt patterns, cope dimensions, and weld specs. Hardware quantities roll up into your BOM alongside steel members.
Works on both shop drawings (full detail extraction) and design drawings (typical connection sheets). Supports US bolt specs (A325, A490) and international grades (8.8, 10.9). Detected hardware feeds directly into pricing — no manual entry for bolts, plates, or anchors.

FIG 04
4,700+ Shapes Across 6 Standards
AISC, EN, BS/IS, AS/NZS, GB (China), and SSMA cold-formed — auto-detected from your drawings. Hot-rolled W-shapes, HEA, HEB, UB, UC, ISMB, UPN — plus 600S162-54, 362T125-43 and the rest of the SSMA catalog.
Imperial or metric — the system detects your standard and adapts automatically. Weight lookups, cross-section properties, and unit conversion built in. Mixed drawings with hot-rolled columns plus cold-formed studs all detect on the same pass.

FIG 05
Nesting-Optimized Order Sheets
First-fit decreasing bin packing arranges your cuts onto standard mill lengths. Visual stick utilization bars show exactly where material goes. Waste percentage color-coded — green under 8%, amber under 15%, red above.
Override mill lengths per category, adjust kerf allowance, and download order-ready sheets. Stop over-ordering steel.

FIG 06
Cut Lists with Measured Lengths
Expandable BOM rows show every occurrence with its measured length. Edit per-piece lengths inline. Total weight calculated from actual lengths, not estimates.
Export as CSV or download the PDF with detection boxes overlaid on your original drawings.

FIG 07
Real-Time Pricing Engine
Instant cost estimates based on current market rates. Adjust markup, labor, and material costs to match your shop.
Configure your own rates, overhead, and profit margins. The free calculator gives you full AISC shape pricing with no account required.

FIG 08
Automatic Coating & Finish Detection
Detects galvanized, HDG, epoxy, primed, and painted finishes near steel labels. Reads page-wide notes like "ALL STEEL GALVANIZED" and applies them automatically. Lintels default to galvanized.
Coatings show up in your BOM and order sheet — no manual tagging.

FIG 09
Your Entire Operation in One Place
Every drawing, every takeoff, every bid — organized by project and accessible from anywhere. Log in from the office, the shop floor, or the job site. Your work is always there.
Store client contact info, attach documents, and track project status across your entire pipeline. One login, every project, every device.

- 4X
- More bids per month for shops on Steelflo
- <5 MIN
- 88% of jobs complete this fast
- 1,891 EA
- Members detected on our largest single job
- 4,000+
- Shapes across AISC, EN, BS/IS, AS/NZS, GB, SSMA
“First time I ran it, I thought the AI was wrong — the count was higher than my own takeoff. I pulled out the drawings to prove it. Turns out I was the one who missed a piece.”
1,891
steel members detected on a single 97-page AISC job. Processing time: 42 SECONDS. The same job takes an experienced estimator 2–3 days by hand.
88%
of takeoffs complete in under 5 minutes — across 92 completed jobs on AISC, AS/NZS, BS/IS, EN, GB, and SSMA cold-formed drawings. The other 12% are still faster than your lunch break.
64 shops across North America, the UK, Australia & New Zealand run takeoffs on Steelflo
The objections — and the real answers
"My takeoffs are too complex for AI."
We’ve run a 97-page AISC structural set with 1,891 steel members. It finished in 42 seconds at the kind of accuracy that makes you double-check us — not the other way around. Your job is not more complex than that one.
"I need to verify everything anyway."
Good — you should. Steelflo gives you a line-by-line output with every member tagged to its sheet and location on the drawing. Verifying takes 20 minutes. Recounting from scratch took eight hours. Those aren’t the same task.
"My current process works."
One of our earliest shops — a structural fabricator that had been running manual takeoffs for years — went from bidding 8 jobs a month to over 30 within their first month on Steelflo. Same estimator. Same drawings. Just not spending 6 hours on each one.
"$399 a month is a lot."
Pro is $399 a month — about $13 a day. Your estimator costs $40 an hour, and Steelflo saves them roughly six hours per takeoff. Run the math: two takeoffs a month and it has paid for itself.
Know your quantities already? Price them in seconds.
The free calculator gives you real-time pricing across 4,700+ shapes (hot-rolled and cold-formed) — no account, no PDF required. Use it alongside Steelflo or on its own.
Pricing
Most customers win back the cost of Steelflo on their first extra bid. Start free — 3 takeoffs included, no credit card required.
Free
$0 / FOREVER
Manual estimating for individual fabricators
- Manual steel estimating calculator
- 4,700+ US & international shapes
- Real-time pricing engine
- Save unlimited estimates
- Client management (CRM)
- 3 free AI takeoffs included
One-Job Pass
NO SUBSCRIPTION$99 / ONE TIME
Got one bid to price? Buy 5 takeoff credits and use them whenever. They don't expire.
ADD AI-POWERED PDF TAKEOFFS
Pro
$399 /MO
Get started- Everything in Free, plus:
- 10 AI takeoffs per month
- Instant steel member detection from PDFs
- Export BOMs to CSV and Excel
- Priority email support
Business
$599 /MO
Get started- Everything in Pro, plus:
- 25 AI takeoffs per month
- Priority phone & email support
Enterprise
$1,499 /MO
Get started- Everything in Business, plus:
- 60 AI takeoffs per month
- Dedicated account manager
- Custom AI model training
- SLA guarantee
Questions fabricators actually ask
SHT S-500 / ISSUED FOR CONSTRUCTION
Your competitor just uploaded their first PDF.
Every day you don't run Steelflo is a day they're bidding three jobs to your one. Pick the one you actually want.
3 FREE TAKEOFFS ON REAL JOBS · 30-DAY MONEY BACK · NO CREDIT CARD